For dry stack walls the base should be as wide as the wall is tall.
Making your own stackable concrete pavers retaining wall.
After you finish the first course fill the space between your retaining wall and.
If needed reposition it using additional.
Continue laying your first course of blocks making sure to check that every block is level.
For this 18 inch high wall the footing should be at least 18 inches wide.
Place a perforated drainage pipe 2 inches up from ground.
In this video i showed how you can make your own concrete stacked stone at home.
Excavate to a depth of 6 inches along the entire base of the stone retaining wall using the string marker as a guide.
If stacking pavers to retain soil and the wall is more than two feet high backfill a couple inches directly behind the wall with gravel.
Prepare the foundation step 1.
Dig for the first row of block.
If you have the option it can be easier to excavate and lay the lowest course before excavating the trench for the next step.
With the layout marked you can begin digging the trench.
The exact depth of the.
To bury the first row.
Molds for cement pavers are available in most large hardware stores.
Whatever your choice do ensure that you have lots of molds.
For row one knock off the flanges with a hammer and chisel so the.
Remember one mold makes only one cement paver and it will take at least two weeks before your cement paver is ready for use.
Stacked stone concrete mold used https amzn to 2leczrs for more details o.
However if you want you can even make your own molds out of plywood.
Use a hand or power tamper to level the base.
Adjust for sloping ground.
For a stacked block retaining wall that s no higher than four feet a trench filled with three inches of crushed rock will help keep the wall from shifting and settling.
For this project you will need.